Simulator Helps Drive Cultural Change Toward Operational Excellence

by | Jul 24, 2017 | Control & Safety Systems, Industry, Power Generation

Jim Cahill

Jim Cahill

Chief Blogger, Social Marketing Leader

At the 2017 Ovation Users Group conference, there was a presentation by an electrical power producer on driving cultural change and operational excellence through the use of simulation in the Ovation distributed control system. The facility had a 92% capacity factor so it was basically running all the time.

The facility was challenged with aging workers and losing valuable experience. They decided to commit to a formal training process and creating a simulation environment which could trip the facility thousands of times to teach operations personnel how to operate and recover the plant from a trip condition.

Other advantages that came with the simulation include performing patches to verify nothing would break before applying to the live control system. Control strategy improvements could be developed and tested in the simulation environment to verify their performance before committing them to the live system. Changes could range from tuning parameters on individual loops to changes in unit operations.

From a user interface perspective, changes could be performed and tested to verify that they improved operations before committing to live system.

From an operational perspective, training is the key benefit. Most operators do not the time and repetition they need on the live system. Scenarios can be developed and trained to grow the experience and confidence of the operators. For new operators coming on board, this is a key part of ramping up the learning curve.

They documented a 44% reduction in startup and shutdown times after implementing the simulator project. This translates directly into the financial returns of the facility.

From a cultural change perspective, developing a spirit of operational excellence required commitment from all levels of the facility. The simulator helped foster a spirit of self-improvement and helps to assure that the operational procedures were closely followed. The whole project from initial planning through commissioning was around 16 months.

Popular Posts

Comments

Follow Us

We invite you to follow us on Facebook, LinkedIn, Twitter and YouTube to stay up to date on the latest news, events and innovations that will help you face and solve your toughest challenges.

Do you want to reuse or translate content?

Just post a link to the entry and send us a quick note so we can share your work. Thank you very much.

Our Global Community

Emerson Exchange 365

The opinions expressed here are the personal opinions of the authors. Content published here is not read or approved by Emerson before it is posted and does not necessarily represent the views and opinions of Emerson.

PHP Code Snippets Powered By : XYZScripts.com